A £90,000 hoarding contract, including site accommodation, has been completed for GKR Scaffolding.
The hoarding, from 2.4m to 7m high with 1.2m low-level boxings, was installed directly to the scaffold gantry, securing the site and providing a safe route for pedestrians, with digilock double doors and single doors to tunnel and powerboard.
The Site Accommodation included a 18m welfare unit with changing rooms and WC cubicles; a 10m site office, as well as an additional small unit.
This was a complex installation on a 435 bedroom development for student accommodation, built by MACE Living.