Case Study

The Hub, Victoria

Buckingham Palace Road, SW1

The Hub is a commercial building, with retail on the ground floor and offices above.  A2O was appointed to install colonnade hoardings, creating a scaffold tunnel.

Fixed to Scaffold

The main pedestrian tunnel is installed with hoardings fixed to scaffolding.

Fixed to Concrete Slab

Other hoardings and protective sheeting, up to 4.5m, are supported by brackets bolted through paving to the concrete slab below and elsewhere by a full-height timber frame.

MCLAREN

MCLAREN

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna.

Barry Atwell

Pre-Construction Manager

  • Contract Value: £ 100,000
  • Feature: Scaffold Tunnel
  • Feature: Colonnade Hoardings
  • Gates: 5m & 3m steel frame gates